Location

Hideout, Utah

Project Duration

2018 – present

Project Type

Trenching, Conduit, and Applicant-Built Line (ABL) Power Line Installation

Scope of Work

Ongoing construction of a mixed multi-family/single-family development with more than 600 units.

Unique Problem Solved

During the future construction phase, we installed power to the sewer pump, bringing the sewer pump online months before Rocky Mountain Power would have accepted the project. This saved the developer hundreds, even thousands, of dollars in construction costs.

Save Time and Money on Your Next Power Line